| According to Transportation Department said | | | | Follow the Hong Kong site settings |
| Merlin to the Huaqiang North film outside the | | | | While this year's TTC bus station will be the road |
| customs zone travel demand 150 000 passengers | | | | to spread outside of Huaqiang North Road, urged |
| per day, of which about 5 million people | | | | the public to walk several hundred meters Road, |
| concentrated in the evening peak travel period | | | | take the bus, but the demand for transport |
| (17:30-20:30), the ideal traffic conditions | | | | capacity and the tension has not been resolved. |
| circumstances, the evening peak bus per 30 | | | | Yesterday, Shenzhen Shijiao Wei, vice director of |
| seconds, made a calculation, Huaqiang North to | | | | Renchen Hui Hong Kong, the British researcher |
| Merlin to provide the best connections with the | | | | Zhu, who appear on the "bridge people" program, |
| outside transport to 3.24 million, can only meet | | | | when people will Huaqiang North evening peak |
| 65% of evening peak passenger demand. In fact, | | | | bursts described as a "gang war", the pay |
| Huaqiang North Area into the bus when the | | | | commission officials said, Huaqiang North buses will |
| average load factor reached 70%, for the Area | | | | enter the single-point-line, setting the stage at |
| to provide the transportation capacity of 1.3 million | | | | each bus stop barrier isolation, "the program has |
| passengers / day, so Huaqiang North bus can only | | | | begun to come out, and is preparing to coordinate |
| meet 26% of passenger travel demand . | | | | relevant departments to transform fence." |
| Huaqiang North Road on the crowds, traffic jams | | | | What is Singlesingle bus plan? More simply, to |
| often | | | | change the current bus line 10 to be squeezed in |
| Single-line for the bus to set the site, which is the | | | | the status of a site, to a small number of bus |
| first time in Shenzhen. Shenzhen Shi Jiaowei guest | | | | lines have a site, so not only improve the |
| head yesterday "people's bridge", said to solve the | | | | efficiency of the car to avoid the phenomenon of |
| traffic congestion, Huaqiang North, Shenzhen will | | | | transit trains, and can order more good waiting. |
| take great measures, Huaqiang North, through the | | | | Hong Kong on the introduction of a site in |
| bus station to set the "single-point single" Run to | | | | downtown areas of two or three bus lines stop in |
| resolve Huaqiang North by car hard. | | | | order to solve the hard drive. Currently, there are |
| Time, Huaqiang North Road, will increase the | | | | three through the site, Huaqiang North Road, |
| number of bus stations, distributed waiting | | | | economy building, Huaqiang North, Huaqiang |
| passengers queuing to improve line flow rate. But | | | | docking stations in a total of 13 bus lines, and |
| the industry said that a bus line is not necessarily | | | | economic buildings stand alone, nearly 10, if in |
| set up a site, it is possible for the two or three | | | | accordance with the single-station single line of |
| bus lines to set up a platform, be known as the | | | | thinking, the site of Bus routes will be distributed |
| "single-station single." | | | | to other bus station platform. |