Maintain The High Rate Of Screw Pumping Know

The world's most General Mechanical methods is acontrol or timer control with pumping) and replace
screw pump of pumping oil, and its most commonthe motor too much.
problem is the pump operation can not be4, downhole gas separator. Invalid gas pump is
completely filled, resulting in low productivity, theoften running interference caused by sound level
pump is not completely filled due to the well pumpmeasurement and dynamometer for diagnosis.
output capacity greater than or not pump gasWould be better to put fluid into the pump inlet
separator at the entrance Well, part of the pumpbelow the layers, placed at the top should be
displacement bullied interference loss, if the gasused if the gas separator. If a short section of
pump to eliminate the interference and control ofthe valve seat arranged in layers of fluid into the
pump operation time, the pump displacement andbottom of the following at least 10ft, air can
the amount of fluid into the bottom hole match,occur in the ring effective gas separation, this
you can improve efficiency and reduce costs. Totime from the separator casing outside the tube
maintain the high rate of screw pumping concreteeffect. However, the condition often do not allow
approaches are as follows:wells to pump fluid into the layer below the place,
  1, surface acoustic wave should be conductedthen consider the use of downhole gas separator.
to determine the yield surface and the relativeConventional gas separator by the fluid into the
depth of the pump intake. If the liquid level abovepart (such as perforation short section), outside
the pump intake, it is impossible to maximum yieldthe tube (such as the bottom plug of a pipeline),
of extraction wells. If the interference effect gasand pump at the bottom of sealing liquid tubes.
production rate, the liquid level above the pump5, control the pump displacement can be carried
intake; if pumping excessive lead to low yield, theout by adjusting the four kinds of control
surface should be pumping at or near theparameters: plunger size, stroke length, the
entrance.number of red pumps, a daily operating time.
2, Indicator Measurement of the pump is full ofSince the cost of equipment due to large, usually
coefficient of percentage of integrated datado not replace the wrong size pump. The easiest
acquisition system can be applied to both motorway is to change the configuration of the ground
power and indicator data. Indicator diagram of oneequipment, such as mobile beam to change the
of the purposes is to diagnose the main pump isground rod and pump stroke length; followed by
running and analysis of how the problemreplacing the pump motor pulley to control the
underground. Application of combined productionimpulse number. Well pump capacity and matching
of liquid level measurement indicator diagram tocapacity to change the date by running time to
learn whether the maximum yield of theachieve the following types of devices can be
production wells, liquid column height is higher thanused to control the running time: air pumping
the pump intake depth, the pump is notcontroller, interval timer and percentage timer. If
completely full, and whether free gas migratesthe controller detects pumping air pump does not
upward along the casing annulus.stop at the pump is fully charged. Timer control
3, diagnosis of inefficient wells. Method of diagnosispump operation time, less expensive and easy to
is to determine the overall efficiency of pumpingoperate. Stop the pump to the bottom of the
system, and to determine the efficiency of simplyshort duration of pressure should be increased no
measuring the total input of the original motivemore than 10% of the reservoir pressure.
power, precise determination of bottom holeOperators can use for each well for the acoustic
pressure and production of production test data.45min, showing the power meter, etc. to
General beam the overall efficiency of pumpingdetermine the well capacity, dynamic downhole
system should be about 50%, if less than thispumps, downhole gas separator dynamic, rod and
should improve its performance. Improve overallbeam pumping unit load, the motor dynamics.
efficiency technology, including maintaining highThrough the analysis of 45min, the operator can
volumetric efficiency (pump shaft into theachieve maximum well production, operating cost
specifications and amount of matching, toreduction.
eliminate gas interference, taking the time to