Automation boosts vertical injection machine quality

The prime aim of the automation of verticalThe modular robots of the E Series afford the
injection machine systems is not to save highplastics processor a great many advantages
labour costs but to ensure high process andwhich, when added together, mean "more output
product quality, says Engel. Nowadays, handlingfor less money": higher speeds and acceleration
devices and robots are "run-of-the-mill" equipmentrates with standard versions, various selectable
in the manufacturing industry.levels of performance for digital drive systems,
In an vertical injection machine shop, for example,extended maintenance intervals and greater ease
the manual placing and removal of inserts is theof servicing (through permanent lubrication of the
exception rather than the rule, and the samerack-and-pinion drives, the use of low-maintenance
goes for the feeding of moulded parts tolinear guides, the use of plug-in limit switches etc.),
downstream finishing stations.The prime aim ofdigital monitoring of the vacuum system for the
automation is not, however, to save "high laboursuction grippers (with display and control
costs" but, rather, to ensure high process andelements), increased number of optional additional
product quality, this being an absolute prerequisitemodules, and, last but not least, availability at an
in a modern production facility.even lower price than that of the previous series
Handling devices and robots operate in an exactly(approx.10 to 15% depending on the actual
reproducible rhythm, and at extremely highequipment fitted).
speeds and round the clock.Besides verticalRobot control systems - intelligent automation
injection machine machines, Engel also offersThe user-beneficial integration of machine and
matching automation systems - from the simplerobot control systems has been one of the main
handling device to the complex production cellobjectives of Engel Automatisierungstechnik
incorporating product-specific downstream finishingGmbH ever since it was founded.Engel's "intelligent"
stations.Since all system units are produced byrobotic systems have been constantly developed
Engel, the responsibility for everything, including CEand improved.
conformity, rests entirely with Engel.EngelThe many improvements achieved in recent
automation, whether standard or special, partial oryears include: the faster synchronization of robot
complete, permits reproducibility to the highestand machine movements - without any additional
standard.hardware - through the use of internal bus
Continuous growth from the very beginning Engelconnections between the respective control
has been involved in automation technology sincesystems, new features for easier operation and
the 70s (at that time it was still the parentprogramming using menu and teach-in modes,
company Engel Maschinenbau), beginning withextended integrated safety functions.
simple pneumatic devices for assisting theSince the launching of Engel's stand-alone robot
demoulding operation.By the middle of the 80s,control system at K 98, the sale of robots for
Engel was already developing servo-actuatedother makes of vertical injection machine machine
handling devices and was soon to lead the way inhas increased considerably.Like the "integrated
this particular field.By channelling its automationversion" (joint operation of the machine and robot
activities into Engel Automatisierungstechnikcontrol systems via the machine's VDU), the
GmbH, which was founded in Steyr in 1985, Engelstand-alone control system is equipped with a
simply surged forward technologically.The Steyrhigh-capacity RISC processor and communicates
production facility commenced operations at thewith the digital drive system and the sensors and
beginning of 1986, with only 20 employees, andactuators of the robot via a CAN bus.From "high
grew continuously over the following ten years.speed" to "low price" Depending on the application,
With a production volume of barely 500 units perthe ERC Series robots are capable of minimizing
year, the company was soon "bursting at thedemoulding times to 0.7 seconds and the total
seams" and the building of a new productioncycle time to around 4 seconds.For standard
facility at nearby Dietach began in 1996.This newapplications, such speeds are really exceptional,
facility, with 7,500 my production space combinedbut when it comes to using machines for special,
with the very latest in process-oriented logistics,fast-cycling applications (e.g thin-wall packaging
as well as 2,500 my office space, commencedcontainers), even these speeds are too slow.For
production at the end of 1997.After the firstsuch high-speed applications, Engel has developed
year, its 120 employees had already built as manyspecial ERS Type high-speed robots which have
as 650 robots and handling devices.Only twoalready proved themselves in actual practice
years later, in the business year 2000/2001, themany times over.
company's work force of 210 employees realizedThis high-speed version permits robot movement
a total production volume of 1000 robots andspeeds of up to 8m/s and an acceleration of up
handling devices.This "magic" number wasto 150m/sec2 - that's 15 times faster than
achieved two years sooner than originally planned,acceleration due to gravity! However, fast speeds
for Engel had set itself a period of five years forand acceleration rates alone do not suffice to
this growth target.Indeed, annual growth ratesachieve extremely fast cycling times.Just as
averaging 25 percent testify to the widespreadimportant is the optimum co-ordination of the
preference for Engel robotic systems.vertical injection machine machine, the injection
For Engel, automation is an essential element ofmould and the robot.The process of "tuning" these
modern vertical injection machine machinethree system components even involves
production.Indeed, it is becoming an increasinglyoptimizing the software running times for the
indispensable means of meeting customerindividual program sequences.This facility is a
requirements.The robot production facility atperformance feature which distinguishes Engel
Dietach has all the necessary means forsystems from those of its competitors.
experimental set-ups and feasibility tests, robotERS high-speed demoulding robots operate so
acceptance tests, with or without machines andfast that it is possible to achieve a total cycle
or moulds, acceptance tests for complextime of only 2 sec and demoulding times of less
automation systems with vertical injectionthan 0.3 sec (the shortest demoulding time
machine machines (up to 3,000kN clamping force)achieved so far is 0.235 sec!).Not every application
and moulds under actual production conditions, andcalls for a high-end robotic system.
prototype production.For demoulding injection moulded parts and
However, in consequence of such rapid anddepositing them on a conveyor belt, the handling
extremely positive development, the originallydevices of the ER-HLi Series represent a
planned reserves of production and office spacelow-cost, integrated means of automation,
are now virtually exhausted, meaning thatespecially in conjunction with Engel tiebarless
extensions to this relatively young productionmachines with clamping forces ranging from 200
facility are already in the decisionto 6,000kN.This compact demoulding robot can be
pipeline.Fortunately, there is still ample room foroptionally mounted on the moving platen or on
expansion at the Dietach site.In parallel with thethe stationary platen.The parts are deposited on
company's developments and activities in Austria,the machine's own integrated conveyor belt
robot production for the North American marketbehind the safety guard, whereby the area
was already transferred in 1995 to a newlyaround the mould remains readily accessible, as
acquired production facility located in immediatethe conveyor belt can be pushed aside whenever
proximity to Engel's vertical injection machinenecessary.The compact design of the system not
machine factory at Guelph, Ontario/Canada.only permits short robot movements and hence
Last year, with a work force of 55 employeesshort cycle times but also minimizes the required
working on a floor area of 4000m2, this newfloor space for the production machine.The
facility manufactured as many as 250 handlingintegration of the robot control into the machine's
devices and robots.While the basic design workcontrol system makes for optimum ease and
for all robotic systems is handled by the Austrianreliability of operation.
company, all customer-specific adaptations andFrom the robot to the tray server "Never lose
options are realized on the spot by the Canadianthe orientation of a part" is one of the
facility.Together, the production facilities in Canadafundamental principles of automation
and Austria plan to manufacture a total of 1,500technology.Consequently, many production facilities
handling devices and robots in the presentmake use of special transport containers and
business year. Engel robots - the ultimate insystems.Widespread use is made of
modularity Today, every handling system,thermoformed plastic trays, especially for parts
whether it is a single-axis sprue removal device orsuch as mobile telephone housings and
a complex ERC (Engel Robot Controlled) partscomponents.The injection moulded parts are
removal system, is modularized down to thedeposited, temporarily stored and then
smallest detail, permitting rapid and flexibletransported in these trays for further finishing and
adaptation to individual automation requirements.assembly (e.g fitting of electronic components).For
Theoretically, the available modules can bethis special logistics application, Engel has extended
combined to produce as many as ten millionits product range to include, among other things,
individual system variants.The modular system onthe so-called tray server.
which Engel robots are based has been developedMoreover, the tray server takes up a minimum
consistently and is now in its fifth generation, theof floor space and, thanks to its integration into
so-called E Series.The smallest E Series robot -the production machine (both into the actual
designed for machines with clamping forcesmachine and into its control system), affords
ranging from 400 to 6,000kN - made its d?but atoptimum ease and reliability of operation.Robots
K 98.The medium-sized version (2,500 toand gripper components on-line Delivery at
18,000kN) has meanwhile gone into production asextremely short notice is becoming an increasingly
well.The largest member of the E Series family ofimportant factor in the automation field.
robots, designed for vertical injection machineWith a view to shortening delivery times, Engel is
machines with clamping forces ranging fromcurrently planning an Internet Ordering vertical
13,000 to 55,000kN, will be presented at Kinjection machine System which will ensure the
2001.The E Series thus covers the entire range offastest possible delivery of robots and gripper
vertical injection machine machine capacitiescomponents to customers in any part of the
currently available on the market.world.